Appendix B. COMMUNITY DEVELOPMENT FEE SCHEDULE Effective October 1, 2014
BUILDING SAFETY
FEE GENERAL NOTES
Building Plan Review Fees . Plan review fees pay for the evaluation of plans to determine compliance with adopted codes and ordinances. These fees are based on a percentage of the calculated building permit fee with a minimum charge for each application. Payment of the plan review fee is in addition to the building permit fee and is non-refundable after plans are accepted and the review is started.
Building Permit Fees . Building inspections are financed by building permit fees. Permit fees for new buildings, additions, and pools are based on the valuation (total construction costs) of the buildings or structure. The determination of the value or valuation will be made on the basis of the Building Valuation Data published in the International Code Council Building Safety Journal and by other valuation criteria approved by the Building Official. Other types of permits have fees based on the amount of time estimated to inspect the project until completion.
In addition to the basic level of inspection services offered, additional inspection services are available through prior arrangement with the Building Safety Department and with payment of the appropriate fee. These services include after-hours, weekend or holiday inspections, re-inspections, optional (not required) inspections and requests for time-specific inspections.
Miscellaneous Fees . Miscellaneous fees are those fees that do not fall under the plan review or inspection areas. These fees are generally based on an hourly rate but may be set on standard administrative costs for providing service.
ADMINISTRATIVE FEES
General Services: Permit Faxing (charged once, faxed in or out) $12.00 Permit Record Change (incl. address change) $36.04 Plan Reproduction Fee (8.5 × 11 and 11 × 17) $3.59 per page Plan Reproduction Fee $116.51 plus printing costs Record Retention Fee (commercial, residential, T.I. plans) 1% of permit ($10.00 min.) Refund of Permit Fee (no inspections made) 20% of permit ($50.00 min.) Expired Permits: Permits expire by limitation and become null and void if the work authorized by the permit has not commenced within 180 days from the date of the permit, or any permit shall expire 180 days after the last approved inspection. (See section 105.5 of the 2012 International Building Code and City of Glendale Ordinance.) Renewals prior to expiration 50% of original permit Renewals after expiration 100% of new permit fees Work prior to issuance of permit 200% of new permit fees Appeals/Modifications/Formal Interpretations: Request for modifications or alternate materials and methods per Section 104 of the City of Glendale Ordinance must first be made to the Building Official, who will conduct the initial review. Initial Review/Non-Structural $116.51 per hr. (2 hr. min.) Initial Review/Structural $116.51 per hr. (2 hr. min.) Requests for Code Modifications or Formal Interpretations from Building Official $116.51 per hr. (3 hr. min.) Renewal of Approval $120.05 (for 3 years) Board of Appeals Single Family Residential $300.42 Non-Single Family $420.59 Lot Combination, Building Code Covenant and Use Agreement, Non-Build Easement Requests $116.51 per hr. (1 hr. min.) Damaged Buildings: Administration $116.51 per hr. (1 hr. min.) Investigation $116.51 per hr. (1 hr. min.) Appeal to Hearing Officer $721.05 Phased Submittals: Plan Review of Phased Designs for New Construction and Additions (foundation only, shell building, etc.). Projects built with phased or partial permits require significantly more coordination time for the plan review and inspection process than do projects built under a single permit. Initial Plan Review Application 100% of plan review fee per building Subsequent Plan Review Submittals (for each phase) 75% of permit based on valuation of submittal Optional Plan Review Services: P.A.S.S. (Permits and Safety Sequence) 75% of permit based on valuation of submittal times three (3) Building Safety Pre-Plan Submittal Meeting $116.51 per hr. (1 hr. min.) Staff Consultation and Research $116.51 per hr. (2 hr. min.) Revisions - (Plan review of changes made to approved plans either before or after permit is issued. Revisions that expand the scope of a permit require a new permit and fees.) $116.51 per hr. (1 hr. min.) Deferred Submittals $116.51 per hr. (2 hr. min.) Certificate of Occupancy: Certificate of Occupancy Included in original permit fee First Temporary Certificate of Occupancy (TCO) $503.67 for a max. of 30 days First 30 day extension of TCO $1,007.34 for an additional 30 days Second 30 day extension of TCO $2,014.71 for an additional 30 days It is expected that no project shall exceed 90 days operation under a Temporary Certificate of Occupancy. Should a third or subsequent extension occur, the fee will double that of the previous extension. For example, the third extension would be $4029.36, the fourth extension would be $8058.72, etc. Change of Occupancy or Use: (Requires both of the following) Plan Review $116.51 per hr. (2 hr. min.) Inspection $108.42 per hr. (2 hr. min.) Copy of Certificate of Occupancy $72.63 per copy Certificate of Occupancy: Tenant Space - no work $108.42 RESIDENTIAL FEES
Plan Review Fees: Plan review fees are due when the permit application is submitted. For combination permits, plan review fees for electrical, mechanical, and plumbing reviews will be collected at the time of permitting. Standard Plans: Base Plan Only-Building 75% of permit fee (min. $116.51) Base Plan plus variations 75% of permit fee (min. $116.51) + $57.28 per EA additional elevation or change to building footprint Electrical Plan Review 75% of the electrical permit fee (min. $116.51) Plumbing Plan Review 75% of the plumbing permit fee (min. $116.51) Mechanical Plan Review 75% of the mechanical permit fee (min. $116.51) Site Plan Review $58.25 per permit Third or Subsequent Review of Plans $116.51 per hr. (1 hr. min.) Annual Renewal of Standard Plans $58.25 per plan Revisions - Plan review of changes made to approved plans before or after permit issued $116.51 per hr. (1 hr. min.) Revisions that expand the scope of a permit require new permit and fees. Truss Calculation Review - Truss package submitted separately from building permit plans or revisions to the truss package are required after permit is issued. $116.51 per hr. (2 hr. min.) Custom Home, Remodel, Room Addition Plans: Building Plan Review 75% of the building permit fee (min. $116.51) Electrical Plan Review 75% of the electric permit fee (min. $116.51) Plumbing Plan Review 75% of the plumbing permit fee (min. $116.51) Mechanical Plan Review 75% of the mechanical permit fee (min. $116.51) Third or Subsequent Review of Plans $116.51 per hr. (1 hr. min.) Revisions - (Plan review of changes made to approved plans before or after permit issued.) $116.51 per hr. (1 hr. min.) Revisions that expand the scope of a permit require new permit and Truss Calculation Review - Truss package submitted separately from building permit plans or revisions to the truss package are required after permit is issued. $116.51 per hr. (2 hr. min.) Permit Fees: Permit fees are based on the valuation of the project, or portion of the project represented by each separate permit. Valuation of the work shall be the estimated cost as determined by the Building Official based on nationally recognized standards and shall include the value of materials, labor, overhead, and profit. See Table 3B (which is the valuation chart) to determine the value of the project. Fees for all permits will be collected at the time of permitting. Building Permit: Per building Based on value, see Table 3A Demolition Permit: Per structure $55.95 per structure Electric Permit : Base Permit Fee $28.24 Electrical Service - 200A or less $36.64 Electrical Service - over 200A $74.66 Electrical Clearance - (Inspection not included w/Electrical permits) When required by utility company to energize service $108.42 per request Temporary Power Meter Installation $144.21 Sub panels $36.64 Appliances - 1 HP or less- dishwasher, cook tops, ranges, wall a/c, washing machines, garbage disposals, water heaters, clothes dryers, space heaters, trash compacters $5.69 EA Livable Floor Area $0.063 SF Receptacles/Switches/Outlets: First 20 fixtures $1.29 EA Additional fixtures $0.84 EA Lighting Fixtures: First 20 fixtures $1.29 EA Additional fixtures $0.84 EA Miscellaneous $21.85 EA Mechanical Permit: Base Permit Fee $28.24 Air Handlers $12.78 Evaporative Coolers $12.78 Furnaces: 100K BTU or less $17.79 over 100K BTU $21.85 Appliance Vents $8.71 EA Vent Fans $8.71 EA Exhaust Hoods $12.78 All-in-one HVAC $17.79 Piggy-backed HVAC (w/evap) $30.57 Miscellaneous equipment/appliances $12.78 EA Repairs/additions to existing equipment $16.45 Mobile Home Plan Review and Permit Fees: Plan Review $116.51 ($58.25 for 1/2 hr.) Site Plan Review $54.05 per permit Installation $144.13 per unit Electrical Upgrade/New Service $108.42 per unit Plumbing Permit: Base Permit Fee $28.24 Fixtures $11.17 EA Sewer $29.61 Water Piping $5.69 100 LF (100 FT min.) Drainage Piping $5.69 100 LF (100 FT min.) Water Heater $14.77 Gas Piping: 5 outlets or less $7.38 each additional outlet $1.29 EA Gas Clearance - (Inspection not included with Mechanical/Plumbing permits) When required by utility company to establish service $108.42 per request Lawn Sprinkler System-(includes backflow device) $17.79 EA Miscellaneous equipment/appliances $11.77 EA COMMERCIAL FEES
Plan Review Fees: Plan review fees are due when the permit application is submitted. For combination permits, plan review fees for electrical, mechanical, and plumbing reviews will be collected at the time of permitting. Building Plan Review 75% of the building permit fee (min. $116.51) Electrical Plan Review 75% of the electrical permit fee (min. $116.51) Plumbing Plan Review 75% of the plumbing permit fee (min. $116.51) Mechanical Plan Review 75% of the mechanical permit fee (min. $116.51) Site Plan Review - For previously approved standards -carports, retaining walls, and bus shelters $54.05 per permit Third or Subsequent Review of Plans $116.51 per hr. (1 hr. min.) Revisions - Plan review of changes made to approved plans before or after permit issued $116.51 per hr. (1 hr. min.) Revisions that expand the scope of a permit require new permit and Truss Calculation Review - When truss package is submitted separate from building permit plans or revisions to truss package are required after permit is issued $116.51 per hr. (2 hr. min.) Plan Review Services Not Otherwise Listed - Plan review of changes made to approved plans before or after permit issued $116.51 per hr. (1 hr. min.) Revisions that expand the scope of a permit require new permit and fees. Permit Fees: Permit fees are based on the valuation of the project, or portion of the project represented by each separate permit. Valuation of the work shall be the estimated cost as determined by the Building Official based on nationally recognized standards and shall include the value of materials, labor, overhead, and profit. See Table 3B (which is the valuation chart) to determine the value of the project. Fees for all permits will be collected at the time of permitting. Minimum Commercial Permit Fee $108.42 Demolition Permit $120.16 per structure Building Permit Based on value, see Table 3A Temporary Power: Meter Installation $144.21 Power Pole or Pedestal $28.24 Distribution System - In addition to pole or pedestal fee construction sites, decorative lights, Christmas tree lots, pumpkin patches, etc. $14.77 Electrical Permit: Base Permit Fee $55.95 Electrical Service: 200A or less $36.64 201A-999A $74.66 over 1000A $108.42 per hr. (3 hr. min.) Electrical Clearance - (At a single site address) When required by utility company to energize service $108.42 per request Gas Clearance - (At a single site address) When required by utility company to establish service $108.42 per request Appliances: Less than 1 HP $5.69 EA More than 1 HP $14.77 EA Receptacles/Switches/Outlets: First 20 fixtures $1.30 EA Additional fixtures $0.84 EA Lighting Fixtures: First 20 fixtures $1.29 EA Additional fixtures $0.84 EA Theatrical-type $1.29 EA Pole or platform mounted $1.29 EA Power Apparatus: 1 HP or less $5.69 EA more than 1 HP less than 10 HP $14.77 EA more than 10 HP less than 50 HP $29.55 EA more than 50 HP less than 100 HP $59.48 EA more than 100 HP $89.51 EA Bus ways, each 100 LF $8.71 EA 100 LF Miscellaneous $27.98 EA Multi-Family Residential Only: Livable Floor Area $0.057 SF Mechanical Permit: Base Permit Fee $55.95 Furnaces and All-in-One HVAC (Package Units): 100K BTU or less $17.79 EA over 100K BTU $21.85 EA Floor Furnace $17.79 EA Suspended, Recessed, Floor Mounted $17.79 EA Heat Pump - Split System $30.57 EA Piggy-back HVAC (w/evap) $30.57 EA 100K BTU or less $17.79 EA over 100K BTU $21.85 EA Repairs/additions to existing equip. $16.45 EA Air Handlers: Less than 10,000 CFM $12.78 EA More than 10,000 CFM $21.43 EA Evaporative Coolers $12.78 EA Ventilation and Exhaust: Appliance Vents $8.71 EA Compensation Air Circulation System $12.78 EA Exhaust Hoods: Type I $167.88 EA Type II $12.78 EA Product Conveying Exhaust System $12.78 EA Vent/Exhaust Fan $8.71 EA Refrigeration Condensors $12.78 EA Refrigeration Evaporators $12.78 EA Incinerators, Commercial and Industrial $17.43 EA Boilers/Compressors/Absorption Systems: ≤ 3 HP or 100K BTU/h $17.43 EA > 3 HP but ≤ 15 HP or > 100K and < 500K $32.60 EA > 15 HP and ≤ 30 HP or > 500K and < 1,000,000 BTU/h $44.76 EA >30 HP and ≤ 50 HP or ≤ 1,000,000 BTU/h and <1,750,000 BTU/h $66.62 EA >50 HP or ≤ 1,750,000 BTU/h $111.33 EA Miscellaneous equipment/appliances $12.78 Chilled/Hot Water Piping (Hydronic) $5.69 per 100 LF (100 FT min.) Plumbing Permit: Base Permit Fee $55.95 Fixtures $11.77 EA Sewer $29.61 Private Sewer Collector: 1-100 FT $0.70 per LF ($38.51 min.) 101-1,000 FT $72.09 plus $0.28/LF over 1,000 FT $342.50 plus $0.10/LF Waste Pretreatment Interceptor $23.90 EA Roof Drains (inside bldg) $11.77 EA Water Piping $5.69 per 100 LF (100 FT min.) Drainage Piping $5.69 per 100 LF (100 FT min.) Water Heater $14.57 EA Gas Piping: 5 outlets or less $7.38 over 5 outlets $1.29 EA Lawn Sprinkler System - (includes backflow device) $17.79 EA Atmospheric Type Vacuum Breaker $14.77 Backflow Devices not Atmospheric: $78.09 per device Miscellaneous equipment/appliances $11.77 EA Swimming Pools and Spa Permits: Site Plan Review $54.05 per permit Secondary Barrier $54.05 per permit Plan Review 75% of total permit Building Permit: In Ground Based on value, see Table 3A Above Ground Based on value, see Table 3A Spas/Hot Tubs Based on value, see Table 3A Electrical Permit $59.48 Plumbing Permit: Public Pool $109.65 Public Spa $73.00 Private Pool $73.00 Private Spa $36.34 Sign Permits: Sign Plan Review 75% of building permit fee (1/2 hr. min. @ $58.25) Building Permit: Subdivision Advertising/Directional Sign $72.09 per sign Construction/Development Sign $72.09 per sign Promo. Pennants, Balloons, Banners, Displays $30.03 per occasion (10 days) Permanent Commercial Sign: Face Change Only $30.03 per sign No Electric $72.09 per sign With Electric $108.42 per sign Billboards: $72.09 per sign EMB Fee Based on value, see Table 3A With Electric $108.42 add per sign Flag Poles $72.09 per pole Electric Permit $72.09 per sign Fence/Wall Permits: Structural Plan Review $116.51 ($58.25 min. for 1/2 hr.) Building Permit: Perimeter residential subdivision walls $0.12 per SF Fence walls over 6 FT in height $0.12 per SF Retaining walls of any height $0.19 per SF Backflow Prevention: Annual Processing Fee $78.09 per site Permit Fee $78.09 per device Hydrant Backflow Permit $68.66 per hydrant Miscellaneous Permits: Carnivals and Circus Events: Plan Review 75% of permit Building Permit $240.34 Electrical Permit (includes generator) $28.24 EA Rides, Displays $8.71 EA System Lighting/Booths $8.71 EA Haunted Houses/Amusements: Plan Review 75% of permit Building Permit $180.26 Electrical Permit (includes generator) $28.24 EA Rides, Displays $8.71 EA System Lighting/Booths $8.71 EA Special Events $120.16 Spray Booths $180.26 ($86.58 EA additional) Shopping Mall Events $300.42 Inspections: Inspections Outside of Normal Business Hours: Weekdays $134.30 per hr. (2 hr. min.) Saturdays, Sundays, Holidays $134.30 per hr. (3 hr min.) Inspections $108.42 Re-Inspections $108.42 EA inspection (2 hr. min.) Inspections of Buildings to be Relocated $108.42 per hr. (1 hr. min.) Investigations $108.42 TABLE 3A BUILDING PERMIT FEES
Total Valuation Fee $1.00 to $500.00 $28.24 $501.00 to $2,000.00 28.24 for the first $500.00 plus $3.65 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $82.99 for the first $2,000.00 plus $16.82 for each additional $1,000.00, or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $469.85 for the first $25,000.00 plus $12.12 for each additional $1,000.00, or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $772.85 for the first $50,000.00 plus $8.40 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $1192.85 for the first $100,000.00 plus $6.71 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $3876.85 for the first $500,000.00 plus $5.70 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $6726.85 for the first $1,000,000.00 plus $4.38 for each additional $1,000.00 or fraction thereof. Note: Valuation chart on the following page may be updated in accordance with Building Standards Magazine or as published. Current publication utilized is Feb. 2014. Table 3B
Group Type of Construction IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, w/stage 229.03 221.51 216.1 207.06 194.68 189.07 200.1 177.95 171.21 A-1 Assembly, theaters w/out stage 209.87 202.35 196.94 187.9 175.62 170.01 180.94 158.89 152.15 A-2 Assembly, nightclubs 177.89 172.85 168.07 161.49 151.98 147.78 155.8 137.68 132.99 A-2 Assembly, restaurants, bars, banquet halls 176.89 171.85 166.07 160.49 149.98 146.78 154.8 135.68 131.99 A-3 Assembly, churches 211.95 204.43 199.02 189.98 177.95 172.34 183.02 161.22 154.48 A-3 Assembly, general, community halls, libraries, museums 176.88 169.36 162.95 154.91 141.73 137.12 147.95 125 119.26 A-4 Assembly, arenas 208.87 201.35 194.94 186.9 173.62 169.01 179.94 156.89 151.15 B Business 182.89 176.17 170.32 161.88 147.55 142.00 155.49 129.49 123.76 B Business - shell 146.31 140.94 136.26 129.50 118.04 113.60 124.39 103.59 99.01 B Business - tenant improvement 36.58 35.23 34.06 32.38 29.51 28.40 31.10 25.90 24.75 E Educational 195.85 189.10 183.56 175.25 163.21 154.58 169.21 142.63 137.99 F-1 Factory and industrial, moderate hazard 108.98 103.99 97.83 94.17 84.37 80.56 90.16 69.50 65.44 F-2 Factory and industrial, low hazard 107.98 102.99 97.83 93.17 84.37 79.56 89.16 69.50 65.44 H-1 High Hazard, explosives 102.01 97.02 91.86 87.20 78.60 73.79 83.19 63.73 N.P. H-234 High Hazard 102.01 97.02 91.86 87.20 78.60 73.79 83.19 63.73 58.67 H-5 HPM 182.89 176.17 170.32 161.88 147.55 142.00 155.49 129.49 123.76 I-1 Institutional, supervised environment 180.72 174.14 169.28 161.12 149.06 145.04 161.12 133.69 129.43 I-2 Institutional, hospitals 308.5 301.79 295.93 287.5 272.14 N.P. 281.1 254.09 N.P. I-2 Institutional, nursing homes 213.56 206.85 200.99 192.56 179.22 N.P. 186.16 161.17 N.P. I-3 Institutional, restrained 208.37 201.66 195.80 187.37 174.54 167.98 180.97 156.48 148.74 I-4 Institutional, day care facilities 180.72 174.14 169.28 161.12 149.06 145.04 161.12 133.69 129.43 M Mercantile 132.61 127.00 121.79 116.21 106.35 103.15 110.52 92.05 88.36 M Mercantile - shell 106.09 101.60 97.43 92.97 85.08 82.52 88.42 73.64 70.69 M Mercantile - tenant improvement 26.52 25.40 24.36 23.24 21.27 20.63 22.10 18.41 17.67 R-1 Residential, hotels 182.28 175.70 170.83 162.68 150.87 146.84 162.68 135.49 131.23 R-2 Residential, multiple family 152.86 146.27 141.41 133.25 122.04 118.01 133.25 106.66 102.41 R-3 Residential, one- and two-family 143.93 139.97 136.51 132.83 127.95 124.61 130.57 119.73 112.65 R-4 Residential, care/assisted living facilities 180.72 174.14 169.28 161.12 149.06 145.04 161.12 133.69 129.43 S-1 Storage, moderate hazard 101.01 96.02 89.86 86.2 76.6 72.79 82.19 61.73 57.67 S-2 Storage, low hazard 100.01 95.02 89.86 85.2 76.6 71.79 81.19 61.73 56.67 S-2.1 Public Parking Garage 53.99 53.99 53.99 53.99 N.P. N.P. 53.99 N.P. N.P. U Utility, miscellaneous 77.1 72.64 68.12 64.64 58.13 54.28 61.62 45.49 43.33 a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. ft.
c. For shell buildings other than B or M occupancies, use 80% of the sq. ft. values provided.
d. Tenant Improvements for other than B and M occupancies, use 20% of sq. ft. values provided.
e. N.P. = not permitted
The Valuation chart is provided by the International Code Council and published in The Building Safety Journal annually.ENGINEERING FEES
PLAN REVIEW FEES Plan Review, Grading, Drainage and SWPPP: First Plan Review $340.26 per sheet Second Plan Review $340.26 per sheet Third Plan Review $340.26 per sheet Revisions $340.26 per sheet Construction Drawings (Civil) : First Plan Review $340.26 per sheet Second Plan Review $340.26 per sheet Third or Subsequent Review $340.26 per sheet Revisions $340.26 per sheet Owner Occupied Single-Family Residence Fee (10% of plan review fee) $34.00 Drainage Report Review: First Review $340.26 per review Second Review $340.26 Third or Subsequent Review $340.26 per review Minor Land Division Minor Land Division $1,045.40 PERMIT FEES Right of Way Permit: Base Fee $120.16 Paving $0.48 SY Manholes/Water Valve Adjustment $54.05 EA Curb and Gutter $0.28 LF Valley Gutter $0.35 SF Sidewalk $0.08 SF Sidewalk Ramps $30.03 EA Driveway - Residential $30.03 EA Driveway - Commercial $240.34 EA Catch Basin/Scuppers $120.16 EA Public Water, Sewer and Storm Drain Permit: Base Fee $120.16 Hydrant Flow Test $60.09 EA Water Line Trench $1.16 LF Sewer Line Trench $0.94 LF Storm Drain Trench $1.18 LF Irrigation (12" and larger) $1.18 LF Manholes $54.05 EA Wet Taps $420.59 EA Grading and Drainage Permit: Base Fee $120.16 Paving (on site) $0.48 SY Catch Basin/Scuppers (private) $120.16 EA Manholes/Drywells (private) $54.05 EA Storm Drain/Private Irrigation (12" and larger) $1.18 LF Dry Utility Permit: Base Fee $210.28 EA Trench (R/W) Paved $0.70 LF Trench (R/W) Unpaved $0.48 LF Pits $12.00 EA Utility Cabinet 30" and above in height $144.13 EA Man Holes $54.05 EA Seal Coat $0.90 SY First Plan Review $180.26 per sheet Second Plan Review $120.16 per sheet Third or Subsequent Review $180.26 per sheet Revisions $120.16 per sheet Emergency Permits: Emergency Permit Annual Fee $600.86 annually Emergency Permit Asphalt Restoration $210.28 Administrative Fees Inspection Services $100.72 per hr. Inspection Services - Overtime $134.30 per hr. Re-Inspection $78.92 per hr. (EA inspection) Investigation Fee-Work Done w/o Permit $300.42 Permit Time Extension or Reinstatement: Within 180 days of expiration or termination 50% of current fee After 180 days of expiration or termination 100% of current fee PLANNING FEES
Zoning Administration: Zoning or Interpretation Letter $193.62 Zoning Verification Letter $136.53 Construction Trailers/Manufactured Buildings $80.58 Seasonal Sales/Temporary Events $80.58 Residential Administrative Relief $205.94 Commercial Administrative Relief $507.03 Administrative Review $507.03 Appeals: Planning Director decision appealed to Board of Adjustment $496.95 Planning Commission action appealed to City Council $396.21 Board of Adjustment appealed to Superior Court $396.21 Continuances: Continuance at the request of applicant $261.91 General Plan Amendments: Major Map Amendment $4.002.58 plus $106.32 per acre Minor Map Amendment $2,005.76 plus $106.32 per acre Major Text Amendment $4.002.58 Minor Text Amendment $2,005.76 Rezoning: Single Residence Districts $2,157.98 plus $106.32 per acre Multiple Residence Districts $3,232.50 plus $106.32 per acre Overlay Districts (PRD, AIO, SCO, HP) $2,157.98 plus $106.32 per acre Planned Area Development (PAD) District $3,232.50 plus $106.32 per acre All Other Districts $4,307.02 plus $106.32 per acre Amendment to any Approved Stipulation $1,074.51 Zoning Ordinance Text Amendment $4,002.58 any length of text, section or topic Concurrent Review Processes: General Plan Amendment - Minor $1,002.87 General Plan Amendment - Major $2,001.28 Rezoning Single Family Districts $1,078.99 plus $106.32 per acre Rezoning Multiple Residence Districts $1,616.25 plus $106.32 per acre Rezoning Overlay Districts (PRD, AIO, SCO, HP) $1,078.99 plus $106.32 per acre Rezoning Planned Area Development (PAD) District $1,616.25 plus $106.32 per acre Preliminary Plat $810.36 plus $27.98 per lot Design Review $830.49 plus $106.32 per acre Subdivisions: Development Master Plan $1,522.21 plus $106.32 per acre Preliminary Plat $1,620.72 plus $27.98 per lot Preliminary Plat Time Extension $349.19 Final Plat $2,722.09 plus $27.98 per lot Conditional Use Permits: Convenience Use $2,380.71 All Others $1,110.32 Appeal to City Council $396.21 Conditional Use Permit as a Result of Unauthorized Construction/Installation $3,964.50 Variances: Single Residence $210.40 All Others $1,477.45 Variance as a Result of Unauthorized Construction/Installation $391.73 single residence Variance as a Result of Unauthorized Construction/Installation $2,216.17 all others Group Homes: Site Review $106.32 Site Reservation $106.32 Medical Marijuana Facilities: Site Review $235.25 Site Reservation $235.25 Preapplications: Planner Pre-application $141.01 Team Pre-application $528.30 Miscellaneous: Third and Subsequent Reviews of Application 50% of initial (base) fee Planner Consultation $55.95 Design Review: Design Review as a result of Unauthorized $2,491.51 Construction/Installation Design Review Waiver Letter $82.82 Design Review - Minor $624.56 Design Review - Major $1,661.01 plus $106.32 per acre Design Review-Single Family Home Product $27.98 per lot Construction Drawings (Landscaping): First Plan Review $340.26 per sheet Second Plan Review $340.26 per sheet Third or Subsequent Review $340.26 per sheet Revisions $340.26 per sheet Landscape Irrigation Permit: Base Fee $420.59 EA Sprinkled Area in Right-of-Way $0.04 SF TRANSPORTATION SERVICE FEES:
Traffic Engineering Plan Reviews: First Plan Review $340.26 per sheet Second Plan Review $340.26 per sheet Third Plan Review $340.26 per sheet Revisions $340.26 per sheet Construction Inspection: Street Light $44.76 EA pole Plan Review, Traffic Control: First Plan Review $44.76 per submittal Second Plan Review $22.38 per submittal Third Plan Review $44.76 per submittal Barricaded Lane Restrictions: Temporary Traffic Control Device Installation and Removal Certification $559.65 Arterial Streets $139.91 per lane, per day, up to 1/2 mile Collector Streets $83.94 per lane, per day, up to 1/4 mile Residential Streets $83.94 per day, up to 1/4 mile Alley Closure $83.94 per day, 1 block Sidewalk Closure $83.94 per day Barricade Manual Violations (Civil Sanctions): Presenting an imminent risk of death or injury to the public within public right-of-way $1,678.93 Restricting roadway without proper certification, a barricade permit and an approved traffic control plan for more than thirty minutes $1,119.29 Restricting traffic during peak hours without authorization of the City's Transportation Director or designee $1,119.29 Failing to correct or cure violations within the time period stated in a warning notice $1,119.29 Restricting traffic at a signalized intersection without active work occurring and an off-duty Glendale and/or sworn Police Officer or Maricopa County Sheriff in uniform not present $1,119.29 Violating restrictions, limits, times, and locations of the Barricade Use permit $559.65 Missing or improper advanced-warning signs $559.65 Missing or improper use of barricades and channelizing devices $559.65 Leaving advance-warning signs facing traffic after restriction has been removed, per direction $279.80 Leaving traffic control in the right-of-way twenty-four (24) hours after Barricade Use Permit has expired $279.80 Rendering a Bus Stop inaccessible without relocating it or making other accommodations $279.80 Use of unacceptable quality of traffic control as shown in the City of Phoenix Barricade Manual $279.80 Annual Utility Permit $12,939.31 per year Civil sanctions doubled . In addition, the City may double any civil sanction under this article up to a maximum amount of two thousand five hundred dollars ($2500.00) for continuing violations within a twenty-four (24) hour period. Each calendar day shall be considered a separate period for the purposes of issuing civil sanctions. FIRE DEPARTMENT FEES CONSTRUCTION PERMITS Access Gates: Access: To install or modify access gates across a fire apparatus access road, or to modify any fire apparatus access road or fire lane, or to modify firefighter pedestrian access into a facility or premises. $300.86 Alternative surface Fire Apparatus Access Roads Install/Modify $300.86 Automatic Fire Protection Systems: Automatic Sprinkler System - New Installation $300.86 (min. fee) First 10,000 SF $0.052 SF Area over 10,000 SF $0.017 SF Note: Each riser will be calculated as a separate system. No system can exceed 52,000 SF For each floor level above or below the grade floor level, add $89.52 For each in-rack storage system add $300.86 Exception: There shall be no permit fee for installing a 13-D residential sprinkler system in a Group R, Division 3 Occupancy that is not used for commercial purposes such as, but not limited to, assisted living or group home use. Automatic Sprinkler System - Modification: 1—20 heads $225.64 21—100 heads $329.51 101—500 heads $590.98 System modifications over 500 heads shall be considered new systems. See New Installation above Modifications not requiring changing or adding sprinkler heads $300.86 Fire Service Mains: First 200 FT $322.36 Each additional 200 FT, or fraction thereof $225.64 Private Hydrants $89.52 EA Modifications, per hydrant $89.52 Piping modifications $300.86 Private fire hydrants, remove from service use or operation. $300.86 Fire Pumps: Single pump $752.14 Each additional pump $601.72 Modifications not requiring a pump test $300.86 Modifications requiring a pump test $451.28 Note: Small booster pumps may be permitted as part of other systems. The multiple pump advantage shall be applied when plans are submitted and work is performed concurrently. Clean Agent, Dry Chemical, Carbon Dioxide, and Other Special Extinguishing Systems: 1—5,000 SF $376.06 Each additional 5,000 SF or fraction thereof $300.86 Automatic Hood Systems: Single system $300.86 Each additional system $150.40 Modification, each system $150.40 Standpipes: 1—10 outlets $300.86 Each additional 1—4 outlets, add $150.40 Modification $300.86 Battery Systems > 50 gallons - Installation $300.86 Fire Alarm System - New Installation: SF of area covered by alarm system: Up to 10,000 SF $488.89 10,001—52,000 SF $729.78 Each additional 52,000 SF or fraction thereof $343.84 For each floor level above or below the grade floor level, add $89.52 Fire Alarm System - Modification: 1—10 devices $300.86 Each additional device over 10 $31.34 Note: Devices shall include, but not be limited to, all initiating and signaling devices such as pull stations, smoke and heat detectors, and audible and visual alarms. Fire Alarm Panel - Installation Only: SF of area covered by alarm system: Up to 10,000 SF $488.89 10,001—52,000 SF $729.78 Each additional 52,000 SF or fraction thereof $343.84 For each floor level above or below the grade floor level, add $89.52 Fire Protection System Monitoring Fire Protection System Monitoring $225.64 Compressed Gas Systems: Installation includes cylinder and all piping, valves and related equipment. $601.72 Compressed Gas System, Modification. If the work performed involves more than 50% of the system, the fees for a new installation shall apply. $300.86 Fire Fighter Breathing Air Systems: Installation $752.14 Modification $376.06 Flammable/Combustible Liquids To install, construct or alter equipment, plants, terminals, wells, refineries, distilleries and similar faculties where flammable and combustible liquids are produced, processed, transported, stored, dispensed or used. $451.28 Tank Installation-first tank $451.28 Tank Installation-each additional tank $300.86 Tanks with fixed fire protection systems, add $300.86 Tanks installed in a vault, add $300.86 Flammable/Combustible Liquid Tanks Modifications $451.28 Tank removal, per tank $300.86 Abandon a tank in place $300.86 Hazardous Materials: First tank $451.28 Each additional tank $300.86 Hazardous Materials Liquid Tank: Modifications $451.28 Tanks with fixed fire protection systems, add $300.86 Tanks installed in a vault, add $300.86 Tank removal, per tank $300.86 Install, repair, close, abandon, or modify any facility or area $752.14 Cryogenic Fluid Systems: Install $451.28 Modify $300.86 Industrial Oven Installation Industrial Oven Installation $300.86 Liquefied Petroleum Gases: LP-Gas system installation. $451.28 Systems with fixed fire protection equipment, add $300.86 LPG System - Modification, each system: $300.86 Spraying or dipping: Installation of spray booths, rooms, areas, or dip tanks Single $451.28 Each Additional $300.86 Modification, each $300.86 Tents, Canopies, and Other Membrane Structures: First $333.08 Multiple: Each additional on the same site $150.40 OPERATIONAL PERMITS Aerosol Products $89.52 Amusement buildings, to operate a special amusement building: $89.52 annually Amusement buildings, to operate a special amusement building: $601.72 temporary Battery Systems - Installation See Construction Permit Section: To maintain lead acid battery systems and VRLA battery systems > 50 gallons $89.52 Carnivals and Fairs, See Outdoor Assembly Events Compressed Gasses - Storage, use, and handling > permit amounts $89.52 Covered Mall buildings Place or construct temporary structures $300.86 To use open flame producing equipment in a mall $300.86 Cars in Malls, see Vehicle Display Cryogenic Fluids, See Hazardous Materials Dry Cleaning Plants To change to a more hazardous fluid $300.86 Exhibits and Trade Shows Aggregate Area Used: 1—5,000 SF $300.86 5,001—50,000 SF $451.28 Greater than 50,000 SF $752.14 Explosives Manufacture, storage, sale or use of explosives, explosive material, or blasting agents, fireworks or pyrotechnic special effect materials $89.52 Blasting fee for the use, handling and storage of explosives used primarily for construction or demolition, 30-day permit $451.28 Fireworks, Outdoor Displays First show $902.57 Repeat shows at same site $150.40 per hr. standby fee (2 hr. min.) Flame Effects Material: Use and Handling: First show $902.57 Repeat shows at same site $150.40 per hr. standby fee (2 hr. min.) Flammable and Combustible Liquids Storage, use and handling of Class I, II, III - A Liquids $89.52 annually To operate a temporary vehicle fueling station $225.64 Pump-over or pump-out storage tanks $225.64 Hazardous Materials: Storage, use and handling > the permit amounts for hazardous materials in Tables 105.6.9, 105.6.11, or 105.6.20. (For F/C liquids see above) $192.50 annually Cryogenic fluids > quantities in Table 105.6.11. $192.50 annually Organic coatings: manufacturing > 1 gallon per day $89.52 annually Pump over or pump out storage tanks $225.64 HPM to store, handle or use HPM materials $192.50 annually High piled storage > 500 SF $89.52 Hot work operations, permanent $89.52 permanent Hot work operations, temporary $300.86 temporary LP Gases: Storage and use $89.52 Temporary use of LPG inside buildings $300.86 Magnesium: processing > 10 pounds $89.52 Open Burning $150.40 Open flames or torches in a hazardous fire area $300.86 Organic coatings: Manufacturing > 1 gallon per day, See Hazardous Materials Outdoor assembly events, carnivals, fair, festivals, etc. $300.86 Place of assembly, to operate a Group A $89.52 Pyrotechnic Special Effects: Use and handling: First show $902.57 Repeat shows at same site $150.40 per hr. standby fee (2 hr. min.) Pyroxylin plastics: Storage use and handling > 25 pounds $89.52 Special Events Special events, Major (as defined in www.glendaleaz.com/fire/special_event_handbook.cfm) $1,053.00 Special events, Minor (as defined in www.glendaleaz.com/fire/special_event_handbook.cfm) $451.28 Special events, extension of premises, each occurrence $300.86 Spraying and dipping operations $89.52 Vehicle Display: The display of liquid or gas fired vehicles or equipment inside a Group A, M, or Covered Mall building, except automotive dealership showrooms. $89.52 Inspection Fees: Inspections requested for other than normal duty hours: Mon. thru Fri. 7 a.m. to 4 p.m. $150.40 per hr. (2 hr. min.) Stand by Fee $150.40 per hr. (2 hr. min.) Hospitals, group homes, nursing care, supervisory care, behavior health, assisted living. The fee schedule is based on the number of licensed beds as determined by the licensing agency. $7.12 per bed ($150.40 min.) Child and Adult day-care Licensed for 50 or less $150.40 Greater than 50 $300.86 Construction inspection fee, shall be assessed for each additional inspection after two follow up inspections $223.85 or the original permit fee (whichever is less) Inspection Fees: Annual Inspections: $313.68 2 Year Inspections: $156.84 4 Year Inspections: $52.27 Existing building inspection fee, shall be assessed for each additional inspection after two follow up inspections $150.40 per hour (1 hr. min.) Operating without a permit (Applies to all permits) 300% of permit fee Plan Review Application fee: Due upon submittal, non-refundable (Applies to all plan reviews) $44.78 (non-refundable) Third Review and subsequent reviews (Applies to all plan reviews) $150.40 per hr. (2 hr. min.) Revisions (Applies to all plan reviews) $150.40 per hr. (1 hr. min.) Expedited plan review (Applies to all plan reviews and includes P.A.S.S. projects) 300% of permit fee Minimum plan review fee when none of the above apply (Applies to all plan reviews) $150.40 per hr. (2 hr. min.) Renewal of expired permit: Within 180 days of expiration 50% of current permit fee After 180 days of expiration 100% of current permit fee Operational Service Fees: Photographs (CD) $9.01 Fire/EMS field incident reports $4.49 plus $.86 per page after 1st page Alternate means and methods or code modification requests. Fee due upon submittal of request. $451.28 Technical Report Review $752.14 Records research for specific information, per address $150.40 or fraction thereof (min. $73.44) Staff consultation and research $150.40 or fraction thereof (min. 1 hr.) UTILITY SERVICES FEES
WATER METER FEES: Meter Size 0.75 inch $120.16 1 inch $210.29 1.5 inch $480.69 2 inch $600.87 3 inch $1,802.63 4 inch $2,643.87 6 inch $4,807.02 8 inch $9,183.78 Hydrant Install/Relocate Fee $90.13 plus $1,642.63 deposit Marker Ball Inspection Fee $89.52 1 inch to 3/4 inch Fitting Fee $57.07 Service Line Relocate Fee up to 13 FT $120.98 PERMIT AND INSPECTION FEES: Significant Industrial User Permit Application Fee: Permit for significant industries that have the potential to damage the sewer and treatment plant infrastructure. $2,163.14 Annual Permit Maintenance Fee: Annual maintenance to help defray the costs of monitoring, inspections, enforcement actions and preparation of reports. $1,141.66 Grease Interceptor Re-Inspection Fee: Fee to encourage compliance with grease interceptor pumping requirements for restaurants and businesses that are required to maintain grease interceptors to prevent entry of grease and oil into the sewer system. $120.16 per visit, after 2 initial visits Non-Significant Industrial User 'B Level' Permit Application Fee: Permit for non-significant industrial users that have the potential to damage the sewer and treatment plant infrastructure. $223.84 Non-Significant Industrial User 'B Level' Permit Annual Maintenance Fee: Annual maintenance fee to help defray the costs of monitoring, inspections, and enforcement actions of non-significant industrial users. $179.07 Grease Bearing Waste Discharger Fee: Annual maintenance fee for compliance inspections of restaurants and others that are required to maintain grease interceptors to prevent entry of oil and grease into the sewer system and to minimize odor complaints. $179.07 Temporary Permit or Manhole Entry Permit: Maintenance fee to defray costs of permitting and inspections. $89.52 issuance Water Main Re-Test Fee: Fee intended to provide incentive to contractors to properly flush and prepare water lines constructed to serve new development. Failure to prepare the lines results in repeated testing by the Water Quality Lab and increased costs. $149.53 per riser, after 2 initial tests General Fees: New Account $22.39 Delinquent Account Fee (Previously Delinquent Collection Fee) $50.35 Collection Agency Referral Refer to Glendale City Code, Chapter 2 Article 1, Sec 2.4 Insufficient Fund Check $26.96 After Hour Reconnect $72.76 Door Tag $16.81 Broken Meter Lock $33.58 Meter Tampering $72.76 Unauthorized Use $72.76 Disconnect Notice $1.12 Miscellaneous Field Visit $22.39 Late Charge (On Past Due Balance) 1.50% Deposit Fees: Residential Meter (single family) $200.00 Other Property Types - Up to 1 ½ meter $250.00 Other Property Types - 2" and larger meter $300.00 Lien Fee $21.14 Meter Test Fees: Meter Bench Test - 1" and smaller $67.15 Meter Bench Test - 1 ½" and larger $111.91 Meter Field Test - 1 ½" and larger $22.38
(Res. No. 4839, § 1(Exh. 1), 8-12-14; Res. No. 4956, §§ 1, 2(Exh. 1), 5-26-15)