§ 5.791. Master Development Plan.  


Latest version.
  • A.

    All applications for the Community Shopping Center district shall include a Master Development Plan for the area of the rezoning request. The plan, at a minimum, will address:

    1.

    The location of all proposed buildings, plazas, and pedestrian walkways.

    2.

    The location of all drive aisles, parking, loading and service areas.

    3.

    The location of all landscaping, retention areas, entry features and perimeter walls.

    4.

    The location of all required public street improvements.

    5.

    A design theme for the center showing the architecture, materials and colors that will be used.

    6.

    The location of all proposed free-standing identification signs.

    7.

    On-site lighting performance measures.

    8.

    The location, type and size of individual uses planned for the center.

    B.

    The Master Development Plan shall be reviewed in conjunction with the rezoning of the property as set forth in Section 3.800 and shall become part of the approval. The Planning Commission and the City Council shall consider conformance of the proposed plan with the General Plan, the commercial design expectations, and the stated purpose of the Community Shopping Center district.

    C.

    The procedure for amending an approved Master Development Plan shall be the same as prescribed for the original approval. No amendment to a CSC district will be approved without concurrent revision of the Master Development Plan.

(Ord. No. 2177, § 4, 12-19-00; Ord. No. O17-51, § 5, 10-24-17)

Editor's note

Ord. No. O17-51, § 5, adopted Oct. 24, 2017, added Section 5.787 and in so doing renumbered former Sections 5.787—5.794 as Sections 5.788—5.795, as set out herein.