Upon completion of any project, any structure not involved or mentioned in the contract
and permit must be in the same or better condition as before the commencement of such
work.
If such uninvolved structure is damaged, repair costs incurred by the city shall be
deducted from the deposit or shall be paid in full by the permittee. However, if said
permittee is capable of conducting such repair himself, he shall repair, with the
approval of the city, all such damaged structures and be subject to all costs involved.
(Ord. No. 1409, § 2, 4-8-86)