§ 33-245. Waste monitoring program.  


Latest version.
  • (a)

    In order to insure continuing compliance with the limitations and restrictions set forth in this Article, each industrial user shall monitor its discharge to the City sewer system by testing the discharge with sufficient frequency to insure that such limitations are not excluded and such restrictions not violated. Such testing may be accomplished by a professional laboratory or, in cases where the user has sufficient testing capability, facilities and expertise, by the user itself.

    (b)

    The City may require a laboratory analysis of a user's discharge at any time. Such analysis shall be performed by:

    (1)

    An independent laboratory acceptable to the City;

    (2)

    A City-operated laboratory; or

    (3)

    The user itself.

    The authority to determine who shall perform the analysis rests with the City Manager, or his/her designee. The City may also require that all costs associated with such an analysis be borne by the user.

    (c)

    The user shall permit access to the sampling point or sampling well to the City's representative or the independent laboratory for the purpose of obtaining a sample during any hours of operation by the plant.

(Ord. No. 3003, § 1(Exh. A), 9-27-16)