§ 33-263. City participation in oversizing cost; extent of participation.  


Latest version.
  • If the City requires a Developer to install an oversized water or sewer line, the City may agree to pay in the increased cost of the line installation caused by oversizing line to plan for future demand. The City's participation in the increased cost shall be limited to the cost differential factor, between the cost incurred to meet existing demand versus the increase cost to meet future demand, provided for in this Article.

(Ord. No. 3003, § 1(Exh. A), 9-27-16)