§ 31-22. Pre-application conferences.  


Latest version.
  • The pre-application conference stage of subdivision review is an investigatory and informational exchange period preceding the preparation and submittal of a preliminary plat application by the subdivider. Pre-application review shall proceed in the following manner:

    (a)

    The subdivider and his engineer shall initially present their proposal and meet with the project manager and project team on an informal basis. The subdivider shall present a general outline of his proposal which shall include sketch plans and ideas regarding land use, street and lot arrangement, lot sizes, and tentative proposals regarding water supply, sewage disposal, grading and drainage, stormwater, retention, and street improvements. The project team shall advise the subdivider of specific city objectives, standards, and regulations related to the subject property; the subdivision design expectations; details and suggestions regarding subdivision platting procedures and requirements; the requirements for citizen participation; and related issues. If appropriate the project team may require a subdivider to revise his initial proposal and present the revised proposal to the project team for additional review.

    (b)

    Following the pre-application conference with the project team, the subdivider shall have a preliminary plat prepared which contains that information and data required for preliminary plats as specified in subsection 31-24(a) and (b) hereof.

(Ord. No. 1561, § 1, 9-13-88; Ord. No. 1952, § 8, 7-22-97)